2011
20
Apr

Day 3-4

Posted by under Uncategorized | 1 Comment

M5 Update:

Chasis has been reassembled and readied for drivetrain.  Rear deck and seats have been installed.  Brakes have been overhauled.

All tasks completed today:  flywheel refinished and installed, new Sachs clutch kit installed, smog/air injection ports plugged, transmission bolted to engine, shifter bushings replaced.

Share this

1 Response to “Day 3-4”

Add Comment

Leave a Reply